A short-run cost schedule holds at least one input fixed. The difference between total cost at successive output levels gives the cost of that extra production. Average cost divides a cost figure by output. These ideas are easier to keep separate when you first calculate them from the same schedule.
Build the schedule
Imagine a workshop with a fixed cost of $60. At two units, variable cost is $30, so total cost is $90. At three units, variable cost is $51 and total cost is $111. Between those two levels, the extra unit adds $21. At three units, average variable cost is $17, average fixed cost is $20, and average total cost is $37.
Notice that adding one unit left the fixed cost unchanged. When output grows, the same fixed cost gets divided across more units. That tells you why average fixed cost falls, even when average variable cost does something else.
Read what marginal cost does to an average
At two units, average total cost is $45. The extra unit costs $21, which pulls the new average down to $37. The same comparison works in the opposite direction. A marginal cost above the current average raises it. In the standard smooth cost diagrams discussed by OpenStax, marginal cost meets the average cost curves at their minima.
Keep units on each value as you sketch the curves. Total cost is dollars at an output level. Average cost and marginal cost are dollars per unit. A student who labels both axes and distinguishes these measures has already avoided a common source of errors.
Continue with Oakgen Agent
Open in Oakgen Agent
The prompt is filled in for you. Review it before sending.


