Meta's Menlo Park headquarters: how the campus is laid out, per city and company records

By Oakgen TeamPublished 3 min read

Share
Meta's Menlo Park headquarters: how the campus is laid out, per city and company records

Meta's headquarters is a cluster of campuses in Menlo Park, California, not a single building. City planning records describe an East Campus at 1 Hacker Way, a West Campus at 1 Facebook Way and a newer pair of office buildings, Buildings 21 and 22, with a public park between them. Sizes below come from City of Menlo Park pages, a Meta announcement and Meta's annual report.

The company's own summary

Meta's Form 10-K for the year ended Dec. 31, 2025 says its corporate headquarters are in Menlo Park, California. As of that date it owned and leased about 10 million square feet of office and building space for headquarters and surrounding areas. That figure included approximately two million square feet of unoccupied space Meta "plan[s] to either sublease, early terminate, or abandon." It also owned and leased about 62 acres of land to be developed for future growth. The filing adds offices in more than 90 cities and 30 owned data center locations, which are separate from the Menlo Park campuses.

East Campus: 1 Hacker Way

The City of Menlo Park lists the East Campus at 1 Hacker Way, previously 1601 Willow Road. Key facts from the city:

  • Size: 56.9 acres.
  • Buildings: nine, totaling about 1,035,840 square feet.
  • History: previously occupied by Oracle, which had earlier been Sun Microsystems.
  • Employee cap: a vehicle trip cap implemented by Meta allows approximately 6,600 employees to occupy the campus.
  • Approvals: the City Council approved the East Campus entitlements in May and June 2012.

West Campus: 1 Facebook Way

The West Campus is about 22 acres at 1 Facebook Way, formerly 312 and 313 Constitution Drive. The city says the project involved demolishing two existing buildings and constructing an "approximately 433,555 square foot building on top of surface parking." The city's expansion page places the next site "between Chilco Street and Building 20 (formerly West Campus)," so the city now uses the name Building 20 for the West Campus. Meta's 2018 post calls its neighbor MPK 20.

Buildings 21 and 22

Next to Building 20, the company redeveloped the former TE Connectivity site at 300 Constitution Drive. According to the city, it "comprehensively redeveloped" the site with two office buildings totaling approximately 962,400 square feet, a net increase of about 126,600 square feet of offices. The city page also records:

  • a citizenM hotel, revised from 200 rooms in the initial approvals to 240 rooms;
  • Meta Park, an approximately 2-acre publicly accessible open space generally between Buildings 21 and 22, connecting Chilco Street to the bridge over Bayfront Expressway;
  • a pedestrian and bicycle bridge over Bayfront Expressway linking Belle Haven to the Bay Trail.

The city lists Buildings 21 and 22, the hotel, Meta Park and the bridge as complete. Its timeline notes a draft environmental impact report published May 26, 2016, a final report released Sept. 15, 2016 and a development agreement approved in late 2016.

What Meta said about MPK 21 in 2018

Meta's announcement, posted Sept. 4, 2018 by John Tenanes, then vice president of global facilities and real estate, introduced the building known as MPK 21. It says the building was designed by Frank Gehry and completed in under 1.5 years. Features listed include:

  • a 3.6-acre rooftop garden with more than 200 trees and a half-mile winding path;
  • a "Town Square" sheltered green space with 40-foot redwoods;
  • "The Bowl," an amphitheater-style courtyard linking MPK 21 with MPK 20, another Gehry building;
  • five dining options, 15 art installations and a 2,000-person event and meeting space;
  • 1.4 MW of rooftop solar producing nearly 2 million kWh a year and a reclaimed water system saving about 17 million gallons a year.

At the time the building was described as targeting LEED Platinum certification; whether it was awarded was not checked. The post also described community commitments: a planned two-acre public park, a planned bike and pedestrian bridge, and a $20 million fund for affordable housing, economic opportunity and tenant assistance. It said Menlo Park remains the company's headquarters. Those items were plans in 2018; the city page above confirms the park and bridge are now built.

Reading these numbers

The sources count different things. City pages give lot sizes and building areas; the 10-K gives total owned and leased space "for our corporate headquarters and in the surrounding areas," which is broader than the campuses above. Do not add the figures together or treat them as a headcount. The Meta post is from 2018, so cross-check any claim there against the city's current pages.

Take this further with Oakgen Agent

Agent can fetch the 10-K and city pages with web search and page fetch, compare what each measures and export a one-page docx or pdf.

Looking for a recap of one specific YouTube video? The YouTube Summarizer does that today.

Open this task in Oakgen Agent

The prompt is filled in for you. Nothing is sent until you press send.

Open in Oakgen Agent

Frequently asked questions

Where is Meta's headquarters?

Meta's Form 10-K for the year ended Dec. 31, 2025 says its corporate headquarters are located in Menlo Park, California. The City of Menlo Park lists the East Campus at 1 Hacker Way and the West Campus at 1 Facebook Way.

How big is Meta's headquarters footprint?

According to the 10-K, as of Dec. 31, 2025 Meta owned and leased approximately 10 million square feet of office and building space for its headquarters and surrounding areas, including about two million square feet of unoccupied space it plans to sublease, terminate early or abandon, plus approximately 62 acres of land to be developed.

What is Meta's East Campus?

The City of Menlo Park describes the East Campus as a 56.9-acre site at 1 Hacker Way, previously 1601 Willow Road, with nine buildings totaling about 1,035,840 square feet. It was formerly occupied by Oracle, which had earlier been Sun Microsystems. A vehicle trip cap allows approximately 6,600 employees.

Who designed MPK 21?

Meta's September 2018 announcement says MPK 21 was designed by Frank Gehry, was completed in under 1.5 years and has a 3.6-acre rooftop garden with more than 200 trees. The announcement described the building as targeting LEED Platinum certification.

Sources

  1. City of Menlo Park, Meta Campus (read 2026-11-19)
  2. City of Menlo Park, Meta Campus Expansion Project (read 2026-11-19)
  3. Meta, Expanding Our Home in Menlo Park, Sept. 4, 2018, updated Nov. 7, 2019 (read 2026-11-19)
  4. Meta Platforms, Form 10-K for fiscal year ended Dec. 31, 2025, Item 2 Properties, SEC EDGAR (read 2026-11-19)